banner

ASHOK INDUSTRY
GST : 27AABFA2791B1ZV

call images

Call us

08069426721

Change Language
ASFOCOAT -160 ASFOCOAT -160 ASFOCOAT -160
ASFOCOAT -160
ASFOCOAT -160 ASFOCOAT -160

ASFOCOAT -160

88.00 INR/Kilograms

Product Details:

  • Solubility SOLUBLE
  • Form Liquid
  • Smell Other
  • Taste Other
  • Classification Other
  • Grade Industrial Grade
  • Usage IRON PHOSPHATING, PRETREATMENT BEFORE POWDER COATING
  • Click to View more
X

ASFOCOAT -160 Price And Quantity

  • 12 Kilograms
  • 95.00 - 120.00 INR/Kilograms
  • 88.00 INR/Kilograms

ASFOCOAT -160 Product Specifications

  • IRON PHOSPHATING, PRETREATMENT BEFORE POWDER COATING
  • Industrial Grade
  • Other
  • Other
  • METAL
  • Industrial Metal
  • Other
  • SOLUBLE
  • Liquid

ASFOCOAT -160 Trade Information

  • 1000 Kilograms Per Day
  • 4 Days
  • Yes
  • Within a certain price range free samples are available
  • CAN
  • Australia North America South America Eastern Europe Western Europe Central America Asia
  • All India
  • ISO 9001:2015

Product Description

Iron Phosphating Chemicals

ASFOCOAT-160 (Spray Cleaning-cum-Phosphating Process)

DESCRIPTION:  

Our ASFOCOAT-160 alongwith ASFOCLEAN-140 used together gives excellent cleaning as well      as an extremely fine complex phosphate coating ideally suited for ferrous sheet metals prior to painting.  The phosphate coating obtained is in the range of 30-50 mg/sq.ft. which gives very good adhesion of paints.  This spray process is most suitable for large  size  metallic  sheets, rolls  or  files, bus bodies, assemblies of vehicle bodies, drums and barrels, and or parts which are inconvenient to handle  and process under dip system.  This process is also suitable for internal lacquering of drums and barrels.

 

NOTES ON APPLICATION :

2. In the spray degreasing chambers, nylon brushes should be incorporated if possible for swabbing.

3. Rusty parts should be derusted separately by dipping in 25% solution of RUST SOLVENT-678 prior to taking such parts on this line. After derusting water rinsing should be done prior to cleaning-cum-phosphating.

4. Phosphating bath should be made fresh every 1 - 2 weeks depending on work load.  

5. Passivation bath should be made fresh every 2 - 3 days.

6. Water rinsing tank as in step 2 could be eliminated if necessary due to space constraint, in which case the passivation bath should be fresh every day

7. Rinsing water should be changed every day.


PACKING :

ASFOCLEAN-140 is in 10 & 30 Litres Polythene Carboys.

ASFOCOAT-160 is in 12 & 40 Kgs. Carboys

 

Enter Buying Requirement Details
Email Id
Mobile number


Back to top